Difference between revisions of "Haebaru Main Line"
Views
Actions
Namespaces
Variants
Tools
Micahmouse (talk | contribs) (Created page with "The Haebaru Railway Haebaru Main Line is a Soranese railway line in Iwate Prefecture that runs from Nishi-Haebaru to Haebaru Port. It is the primary railway line operated by the Haebaru Railway Company. Construction of the line began in 1970, to coincide with the opening of the Iwate Line. However, the line was plagued by numerous delays, and the line was finished 6 years late in 1978, as a third-sector line, between Reihoku Statio...") |
Micahmouse (talk | contribs) m (→History) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The Haebaru Railway Haebaru Main Line is a | The Haebaru Railway Haebaru Main Line is a railway line in [[Haebaru Prefecture]] that runs from [[Nishi-Haebaru Station|Nishi-Haebaru]] to [[Haebaru Port]]. It is operated by the [[Haebaru Railway Company]]. Construction of the line began in 1942. However, the line was plagued by numerous delays, and the line was finished 2 years late in 1950, between [[Reihoku Station|Reihoku]] and [[Ojika Station|Ojika]]. The line features the longest wooden viaduct in the world from Reihoku to Tabuse, and after the absorption of the 2,703m Kamichiiba Tunnel with the handover of the western portion of the [[Iwate Line]]. | ||
Unlike most third-sector lines, the Haebaru Main Line made steady profits after the full opening of the line, as the former ''[[Haebaru (Train)|Haebaru]] Limited Express'' used the line, serving as the primary rail link between Lamtsu and West Joban, until the opening of the [[Seiyo Shinkansen]] in 2022. The line's former speed limit of 160km/h meant that the Haebaru was the fastest non-shinkansen service in the region, matched only by [[Harmony Rail Transit (Joban)|HRT (Joban)'s]] Icefire Express. However, following the withdrawal of Haebaru services from the line on 1st June 2022, the line's maximum speed limit was reduced from 160km/h to 120km/h. | Unlike most third-sector lines, the Haebaru Main Line made steady profits after the full opening of the line, as the former ''[[Haebaru (Train)|Haebaru]] Limited Express'' used the line, serving as the primary rail link between Lamtsu and West Joban, until the opening of the [[Seiyo Shinkansen]] in 2022. The line's former speed limit of 160km/h meant that the Haebaru was the fastest non-shinkansen service in the region, matched only by [[Harmony Rail Transit (Joban)|HRT (Joban)'s]] Icefire Express. However, following the withdrawal of Haebaru services from the line on 1st June 2022, the line's maximum speed limit was reduced from 160km/h to 120km/h. | ||
Line 25: | Line 25: | ||
!Stops at | !Stops at | ||
!Time taken | !Time taken | ||
! | !Tph | ||
|- | |- | ||
! colspan="4" |'''Daily''' | ! colspan="4" |'''Daily''' | ||
Line 32: | Line 32: | ||
|Ojika, HRT Maglev Technology Research Institute, Tabuse, Reihoku, Higashi-Reihoku, Kamichiiba, Haebaru Port | |Ojika, HRT Maglev Technology Research Institute, Tabuse, Reihoku, Higashi-Reihoku, Kamichiiba, Haebaru Port | ||
|12m | |12m | ||
| | |1 | ||
|- | |- | ||
|Rapid | |Rapid | ||
|Nishi-Haebaru, Shin-Haebaru, Ojika, Reihoku, Haebaru Port | |Nishi-Haebaru, Shin-Haebaru, Ojika, Reihoku, Haebaru Port | ||
|7m | |7m | ||
| | |1 | ||
|- | |- | ||
|Shuttle | |Shuttle | ||
|Nishi-Haebaru, Shin-Haebaru, Ojika | |Nishi-Haebaru, Shin-Haebaru, Ojika | ||
|2m | |2m | ||
| | | - | ||
|- | |||
|''[[Haebaru (Train)|Haebaru]]'' | |||
|[[Shin-Haebaru Station|Shin-Haebaru]], [[Ojika Station|Ojika]], [[Iwate Station|Iwate]], [[Lamtsu Cliffs Station|Lamtsu Cliffs]], [[Misato Station|Misato]] | |||
|18m | |||
|1 | |||
|- | |- | ||
| colspan="4" |''' | |''[[Ojika (Train)|Ojika]]'' | ||
|[[Shin-Haebaru Station|Shin-Haebaru]], [[Ojika Station|Ojika]], [[Misato Station|Misato]] | |||
|16m | |||
|1 | |||
|- | |||
| colspan="4" |'''Seasona''' | |||
|- | |- | ||
|Express | |Express | ||
Line 55: | Line 65: | ||
|6m | |6m | ||
|1 | |1 | ||
|} | |} | ||
Line 83: | Line 83: | ||
!Chiba Line | !Chiba Line | ||
!Haebaru | !Haebaru | ||
!Ojika | |||
!Ojika Line | !Ojika Line | ||
!Distance from Ojika | !Distance from Ojika | ||
!Transfers | !Transfers | ||
!Locale | |||
|- | |- | ||
|西南風原 | |西南風原 | ||
|Nishi-Haebaru | |[[Nishi-Haeberu Station|Nishi-Haebaru]] | ||
|N.A. | |N.A. | ||
|● | |● | ||
|N.A. | |N.A. | ||
|● | |● | ||
|N.A. | |||
|N.A. | |N.A. | ||
|N.A. | |N.A. | ||
|Through to Ojika Line | |Through to Ojika Line | ||
|0.4 | |0.4 | ||
|[[Ojika | |[[Godo Line]] | ||
| rowspan="4" |[[Ojika|Ojika Town]] | |||
|- | |- | ||
|新南風原 | |新南風原 | ||
|Shin-Haebaru | |[[Shin-Haebaru Station|Shin-Haebaru]] | ||
|N.A. | |N.A. | ||
|● | |● | ||
Line 106: | Line 110: | ||
|● | |● | ||
|N.A. | |N.A. | ||
| | |● | ||
|● | |||
|● | |● | ||
|0.2 | |0.2 | ||
|[[Seiyo Shinkansen]] | |[[Seiyo Shinkansen]] | ||
[[Ojika Line]] | [[Ojika Line|Godo Line]] | ||
|- | |- | ||
|小値賀 | |小値賀 | ||
|Ojika | |[[Ojika Station|Ojika]] | ||
|● | |||
|● | |● | ||
|● | |● | ||
Line 123: | Line 129: | ||
|0.0 | |0.0 | ||
|[[Ojika Line]] | |[[Ojika Line]] | ||
[[Godo Line]] | |||
[[Chiba Line]] | [[Chiba Line]] | ||
[[Reihoku Line]] | |||
|- | |- | ||
|調和鉄道輸送リニアモーターカー技術研究所 | |調和鉄道輸送リニアモーターカー技術研究所 | ||
| | |[[NHR Maglev Technology Research Institute Station|NHR Maglev Technology Research Institute]] | ||
|● | |● | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
Line 132: | Line 141: | ||
|N.A. | |N.A. | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki>|<nowiki>| </nowiki> | ||
|N.A. | |N.A. | ||
|0.6 | |0.6 | ||
Line 138: | Line 147: | ||
|- | |- | ||
|田布施 | |田布施 | ||
|Tabuse | |[[Tabuse Station|Tabuse]] | ||
|● | |● | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
Line 144: | Line 153: | ||
|N.A. | |N.A. | ||
|● | |● | ||
|<nowiki>| </nowiki> | |||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|N.A. | |N.A. | ||
|2.3 | |2.3 | ||
|[[Chiba Line]] | |[[Chiba Line]] | ||
| rowspan="3" |[[Reihoku Town]] | |||
|- | |- | ||
|苓北 | |苓北 | ||
|Reihoku | |[[Reihoku Station|Reihoku]] | ||
|● | |● | ||
|● | |● | ||
Line 156: | Line 167: | ||
|N.A. | |N.A. | ||
|● | |● | ||
|<nowiki>| </nowiki> | |||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|N.A. | |N.A. | ||
|4.7 | |4.7 | ||
|[[Chiba Line]] | |[[Chiba Line]] | ||
[[Reihoku Line]] | |||
|- | |- | ||
|東苓北 | |東苓北 | ||
|Higashi-Reihoku | |[[Higashi-Reihoku Station|Higashi-Reihoku]] | ||
|● | |● | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|N.A. | |N.A. | ||
|<nowiki>| </nowiki> | |||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
Line 174: | Line 188: | ||
|- | |- | ||
|上地伊庭 | |上地伊庭 | ||
|Kamichiiba | |[[Kamichiiba Station|Kamichiiba]] | ||
|● | |● | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|<nowiki>| </nowiki> | |<nowiki>| </nowiki> | ||
|N.A. | |N.A. | ||
| colspan=" | | colspan="3" rowspan="2" |Service to Chiba Line | ||
|N.A. | |N.A. | ||
|7.9 | |7.9 | ||
| | | | ||
| rowspan="2" |[[Chiba Town]] | |||
|- | |- | ||
|南風原港 | |南風原港 | ||
|Haebaru Port | |[[Haebaru Port Station|Haebaru Port]] | ||
|● | |● | ||
|● | |● | ||
Line 196: | Line 211: | ||
== History == | == History == | ||
The Haebaru Main Line was constructed by the | The Haebaru Main Line was constructed by Nantetsu in 1942, and later was connected to the Iwate Line, connecting the Fung Yuen Main Line to the Ome Line via the Iwate Line. The Haebaru Main Line also would increase transport connections in the Haebaru District. When the permafrost melting due to global warming caused the Iwate Line to be closed from Kawabe to Reihoku, the Haebaru Main Line absorbed the remainder, and a branch was constructed from Higashi-Reihoku to Haebaru Port, allowing for ferries to the Iwate Line. |
Latest revision as of 11:21, 10 February 2023
The Haebaru Railway Haebaru Main Line is a railway line in Haebaru Prefecture that runs from Nishi-Haebaru to Haebaru Port. It is operated by the Haebaru Railway Company. Construction of the line began in 1942. However, the line was plagued by numerous delays, and the line was finished 2 years late in 1950, between Reihoku and Ojika. The line features the longest wooden viaduct in the world from Reihoku to Tabuse, and after the absorption of the 2,703m Kamichiiba Tunnel with the handover of the western portion of the Iwate Line.
Unlike most third-sector lines, the Haebaru Main Line made steady profits after the full opening of the line, as the former Haebaru Limited Express used the line, serving as the primary rail link between Lamtsu and West Joban, until the opening of the Seiyo Shinkansen in 2022. The line's former speed limit of 160km/h meant that the Haebaru was the fastest non-shinkansen service in the region, matched only by HRT (Joban)'s Icefire Express. However, following the withdrawal of Haebaru services from the line on 1st June 2022, the line's maximum speed limit was reduced from 160km/h to 120km/h.
Technical Details
- Distance: 8.4km
- Operators
- Track: Fully double-tracked
- Electrification: 1500V DC
- Signalling: Token
- Maximum Speed:
- Haebaru Port-Kamichiba: 60km/h
- Kamichiba-Higashi-Reihoku: 120km/h
- Higashi-Reihoku-Reihoku: 60km/h
- Reihoku-HRT Maglev Technology Research Institute: 120km/h
- HRT Maglev Technology Research Institute-Nishi-Haebaru: 60km/h
Services
After the opening of the Seiyo Shinkansen in 2022, many services have been withdrawn.
Service | Stops at | Time taken | Tph |
---|---|---|---|
Daily | |||
Local | Ojika, HRT Maglev Technology Research Institute, Tabuse, Reihoku, Higashi-Reihoku, Kamichiiba, Haebaru Port | 12m | 1 |
Rapid | Nishi-Haebaru, Shin-Haebaru, Ojika, Reihoku, Haebaru Port | 7m | 1 |
Shuttle | Nishi-Haebaru, Shin-Haebaru, Ojika | 2m | - |
Haebaru | Shin-Haebaru, Ojika, Iwate, Lamtsu Cliffs, Misato | 18m | 1 |
Ojika | Shin-Haebaru, Ojika, Misato | 16m | 1 |
Seasona | |||
Express | Ojika, Haebaru Port | 6m | 1 |
Reihoku | Ojika, Reihoku, Haebaru Port | 6m | 1 |
Station List
Legend
●: All trains stop
| : All trains pass
Jap | Station | Local | Rapid | Express | Shuttle | Chiba Line | Haebaru | Ojika | Ojika Line | Distance from Ojika | Transfers | Locale |
---|---|---|---|---|---|---|---|---|---|---|---|---|
西南風原 | Nishi-Haebaru | N.A. | ● | N.A. | ● | N.A. | N.A. | N.A. | Through to Ojika Line | 0.4 | Godo Line | Ojika Town |
新南風原 | Shin-Haebaru | N.A. | ● | N.A. | ● | N.A. | ● | ● | ● | 0.2 | Seiyo Shinkansen | |
小値賀 | Ojika | ● | ● | ● | ● | ● | ● | ● | ● | 0.0 | Ojika Line | |
調和鉄道輸送リニアモーターカー技術研究所 | NHR Maglev Technology Research Institute | ● | | | | | N.A. | | | | | N.A. | 0.6 | |||
田布施 | Tabuse | ● | | | | | N.A. | ● | | | | | N.A. | 2.3 | Chiba Line | Reihoku Town |
苓北 | Reihoku | ● | ● | | | N.A. | ● | | | | | N.A. | 4.7 | Chiba Line | |
東苓北 | Higashi-Reihoku | ● | | | | | N.A. | | | | | | | N.A. | 5.0 | ||
上地伊庭 | Kamichiiba | ● | | | | | N.A. | Service to Chiba Line | N.A. | 7.9 | Chiba Town | |||
南風原港 | Haebaru Port | ● | ● | ● | N.A. | N.A. | 8.4 |
History
The Haebaru Main Line was constructed by Nantetsu in 1942, and later was connected to the Iwate Line, connecting the Fung Yuen Main Line to the Ome Line via the Iwate Line. The Haebaru Main Line also would increase transport connections in the Haebaru District. When the permafrost melting due to global warming caused the Iwate Line to be closed from Kawabe to Reihoku, the Haebaru Main Line absorbed the remainder, and a branch was constructed from Higashi-Reihoku to Haebaru Port, allowing for ferries to the Iwate Line.