The District of Joban Misato Station

Misato Station

From The District of Joban
Revision as of 12:35, 26 April 2022 by Micahmouse (talk | contribs) (2021 Platform layout)
美里站
Misato Station



General Information
Location 1552 ~ 31943
Owned by Harmony Rail Transit (Lamtsu)
Operated by Harmony Rail Transit (Lamtsu)

Misato Rapid Transit Kabuki Kaisha (MRT Corp)

Lamtsu Rapid Transit Kabuki Kaisha (LRT Corp)
Line(s) Yamate Line

Mihara Line Ome Line Namboku Line Sakuho Line Ome Heritage Line

Vtuber Park Line (Up to 2022 February)
Platforms 13
Tracks 13
Connections MRT Misato Station Misato Light Rail Stop
Structure Type At-Grade+Elevated
Platform Levels 3
Disabled Access No
Station Code MS
Opened 30 June 1947 (Initial Opening)

1st May 2022 (Heritage Platforms)

30 June 2022 (Full Reopening)
Closed 31st Jan 2022 (Reconstruction)


Misato Station is a HRT (Lamtsu) station in Misato City, Lamtsu Capital City, Hon Kwong Province, Empire of Sorano. The Station was the most important station in the HRT Network in Lamtsu, being the primary terminus for long-distance lines to Joban and South-East Sorano. It was also the 3nd busiest Station in the Joban-Sorano Region, with more than 700,000 commuters using the station in June 2016. The station was closed for reconstruction after the HRT (Lamtsu) scandals that followed the 2022 Sora train wreck, with many of the Main Lines being rerouted away from the station and the Kansai Main Line being split off to the MRT Corporation.

History

Conception

Misato Station was originally conceived as the terminus of the Yamate Line in 1946. However, pressure from the local government forced the extension of the Line to Hikawa, delaying its opening by a year. The original station was constructed at-grade, with the Yamate Line platforms adjacent to Misato Hill.

Further Expansion

With the opening of the Namboku Line in 1968 and the Completion of the Kujukuri-Sakuho Line in 1975, Misato Station replaced Lamtsu station as the de facto primary interchange. however, Misato City Railway maintained that Lamstu station was the main terminus, making it the de jure interchange and therefore received the bulk of the funding. This resulted in the infrastructure of Misato Station being very lacking.

Subsequent platforms were built on a separate station building and elevated, for the terminating 4-car lines on ground level. However, the lack of funding and the prohibitive land costs in Misato prompted the platform width to be reduced from the 10m standard on the Yamate Line to 5 metres for the elevated platforms. By 2015, Misato Station was severely overcrowded, with reports of suffocations due to lack of platform space being not uncommon. This was further exasperated due to the cross-platform transfers between the Mihara and Namboku lines, where crowds of passengers would often crush each other in an attempt to squeeze onto the trains. By this time, almost every line would pass through or terminate at Misato, excluding the Tozai Line and the Chuo Main Line. As the Chuo Main Line was built by HRT and not Misato City Railway (Now MRT), the Line was prohibited from cutting across the Yamate Line and the decision was made for it to terminate at Otaki, with some services continuing to Fukaaura.

The Layout of the platforms prior to the 2022 Rebuild was this:

2021 Platform Layout
B1
Sakuho Line for Kamiyama (From the Kujukuri Line)→
Island Platform (To Concourse)
←Kujukuri Line for Tsubetsu (from the Sakuho Line)
G (Indoors)
Side Platform
1: Ome Line (Urban)
2: Ome Line (Rapid)
Island platform
3: Ome Liner
4: Ai Liner
Island Platform
5. Vtuber Park Line
6. Kansai Main Line (Local)
Island Platform
7. Kansai Main Line (Rapid)
8. Kansai Main Line (Express)
Island Platform
9. Kansai Main Line (Urban)
10. Tohoku Liner
Side Platform
G
19. Yamate Line (Soto-Mawari)→
Island Platform
20. ←Yamate Line (Uchi-Mawari)