Grundorf Express
From The District of Joban
Views
Actions
Namespaces
Variants
Tools
Grundorf Express
General
Owner | KCRC |
---|---|
Locale | East Joban Southern Joban Grundorf Island |
Termini | Surry Quays Grundorf |
Stations | 3 |
Initials | GE |
Service
Type | Commuter Rail |
---|---|
Operator(s) | Grundorf Metro / KCR |
History
Operating speed | 140km/h (Average) |
---|
Route Map
The Grundorf Express (Chinese: 君渡快綫) is a commuter rail operated by both the KCR and Grundorf Metro.
With its construction starting in 2006 and ending in July 2023, the Grundorf Express serves as a faster service next to the Grundorf line, connecting Surry Quays, Yat Kwai and, after september 2023, Grundorf Station.
It is operated by CAF express trains at a speed of 300 Km/h (~186.41 Mp/h). The main depot is located at Surry Quays.