The District of Joban Tohoku Shinkansen

Tohoku Shinkansen

From The District of Joban
Revision as of 17:57, 17 April 2022 by 1081MTR (talk | contribs) (Created page with "{{InfoBox |title=Tohoku Shinkansen |colorline1=#1BC4EF |image=2022-03-08_12.43.12.png |imgdesc=An KCR E5 CAF Train boarding at Central South station |category1=Overview |operators=KCRC |terminus=Central South<br />Fuka<br />Adobe<br />Touhou |stations=8 |serviceCategory=Service |line_type=Express |depots=Adobe<br />Touhou |rolling_stock=[https://en.wikipedia.org/wiki/MTR_Adtranz%E2%80%93CAF_EMU Adtranz-CAF] |former_ro...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Tohoku Shinkansen
2022-03-08 12.43.12.png
An KCR E5 CAF Train boarding at Central South station
Overview
Termini Central South
Fuka
Adobe
Touhou
Number of stations 8
Service
Type Express
Operator(s) KCRC
Rolling stock Adtranz-CAF
Depot(s) Adobe
Touhou
History
Opened July 7, 2001
Line Length 35km
Track gauge 1,435mm
Electrification 3 kV DC

The Tohoku Shinkansen (Chinese: 東北新幹線) is a express rs transit operated by KCR.

The route has a total of 8 Stations.

History

The Tohoku Shinkansen formerly is Joestu Express and Sleigh Liner

Joestu Express

Joestu Express has a total of 3 Stations, plan for 6 cars.

Joestu Express
Station Name Station Name (English) Connections Opening Date
負荷 Fuka Joestu Line, Fuka Lightrail

Rigel Line Airport Express

7 July 2001
華生東 Watson East Watson Station 7 July 2001
阿豆比 Adobe Surry Quays 7 July 2001

Dispute

Platforms use by Joestu Express in Fuka design just for 4 cars, but Watson East and Adobe already build platforms for 6 cars,finally plan Joestu Express both 4 cars and 6 cars are run on the Joestu Express.

Sleigh Liner

The KCRC also made proposals to plan, build, and operate the Sleigh Liner, a new railway parallel to Joestu Line to make going to Sendai faster; the KCRC received permission for the project from the government on 24 September 2007. Disputes on the funding and, postponed the construction by a year to 2008. Construction started on 7 June 2008. The new link started operation on 16 August 2010.

Sleigh Liner first plan has total of 3 Stations , plan for 4 cars.

Sleigh Liner
Station Name Station Name (English) Connections Opening Date
負荷 Fuka Joestu Line, Fuka Lightrail

Rigel LineAirport Express,Joestu Express

16 August 2010
阿豆比 Adobe Joestu Express 16 August 2010
東方 Touhou Joestu Line,Aozora Line 16 August 2010