The District of Joban Mei Tao Light Rail

Mei Tao Light Rail

From The District of Joban
Revision as of 14:29, 1 May 2022 by Micahmouse (talk | contribs) (Created page with "{{InfoBox route|title=Mei Tao Light Rail|depots=Mei Tao Depot|operate_speed=40km/h|electrification=0%|track_gauge=1435 mm|line_length=700m|technical_category=Technical Details|line_opened=April 1st 2022|hist_category=History|rolling_stock=Light Rail|operators=Harmony Rail Transit (Lamtsu)|colorline1=d65d11|line_type=Light Rail|service_category=Service Details|station_amount=2|terminus=Mei Tao Mei Tao Village|locale=Sorano|owner=Harmony Rail Transit (Joban)|status=operati...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Mei Tao Light Rail
General
Status operational
Owner Harmony Rail Transit (Joban)
Locale Sorano
Termini Mei Tao Mei Tao Village
Stations 2
Service
Type Light Rail
Operator(s) Harmony Rail Transit (Lamtsu)
Depot(s) Mei Tao Depot
Rolling stock Light Rail
History
Opened April 1st 2022
Technical
Line Length 700m
Track gauge 1435 mm
Electrification 0%
Operating speed 40km/h


The Mei Tao Light Rail is a Light Rail system in Mei Tao, Sorano. The 700m line is the shortest of all the lines, light rail or heavy rail, operated by Harmony Rail Transit (Joban). It functions as an effective continuation of the Capital East Line from Mei Tao station, as there are minimal developments around Mei Tao station. The line links Mei Tao Village to Mei Tao CEL station.

Stations

No. Station CJK Distance Transfers Location
HRT-0021L Mei Tao 梅萄 0.0 Capital East Line Mei Tao, Sorano
HRT-0021Lb Mei Tao Village 梅萄村 0.7

History

The line opened on April 1st 2022.

See Also

Tai Hing Tram