Joestu Line Suburban Section
From The District of Joban
Views
Actions
Namespaces
Variants
Tools
Revision as of 17:49, 24 June 2022 by LX86 (talk | contribs) (Created page with "The Joestu Line Countryside Section (Also known as Joestu Line Phase 3) is a suburban rail operated by KCRC The route has a total of 24 Stations and is 40km long, making it the longest route in Joban. === Path refreshing === As the section extends as time goes on, new depot are built every few stations to speed up services. A total of at least 10 depots are responsible for operating this line, combining with the length of the line, this would put an extreme amount...")
The Joestu Line Countryside Section (Also known as Joestu Line Phase 3) is a suburban rail operated by KCRC
The route has a total of 24 Stations and is 40km long, making it the longest route in Joban.
Path refreshing
As the section extends as time goes on, new depot are built every few stations to speed up services.
A total of at least 10 depots are responsible for operating this line, combining with the length of the line, this would put an extreme amount of stress to the server when refreshing, usually resulting in less than 10TPS on the initial path refreshing.
It would take around 45 minutes to 1 Hour to fully refresh all the depot, therefore it is not recommended to refresh this section unless necessary.