The District of Joban File:RDS 2022 - Future Railway Network (Airport Railway).png

File:RDS 2022 - Future Railway Network (Airport Railway).png

File on The District of Joban
Revision as of 22:43, 3 July 2022 by StrikeSNC (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

RDS_2022_-_Future_Railway_Network_(Airport_Railway).png(512 × 554 pixels, file size: 38 KB, MIME type: image/png)

Due to the overcapacity of the current Airport, a new Airport is currently being planned. The existing Airport will be named as "Terminal 2", while the new Airport will be named as "Terminal 1" In accordance with this new plan, Route alignment on the Rigel Line and Airport Express will be adjusted.

Under the new proposal, Rigel Line will stop at Central South and Racecourse, and terminating at the Airport (Terminal 1). Airport Express will stop at Central South, Airport (Terminal 2) and Airport (Terminal 1).

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current22:43, 3 July 2022Thumbnail for version as of 22:43, 3 July 2022512 × 554 (38 KB)StrikeSNC (talk | contribs)

The following page uses this file: