Difference between revisions of "Azure Line"
From The District of Joban
Views
Actions
Namespaces
Variants
Tools
m (Fix) |
|||
Line 4: | Line 4: | ||
== History == | == History == | ||
On November 12th, | On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever. | ||
'''''[To be completed]''''' | '''''[To be completed]''''' |
Revision as of 00:02, 18 August 2024
Azure Line
A poster made for the opening of Azure Line
General
Status | Operational |
---|---|
Owner | OrchidLink |
Termini | Odysseus Kakai |
Stations | 11 |
Service
Type | Rapid Transit |
---|---|
Operator(s) | OrchidLink |
History
Opened | November 12th, 2023 |
---|
Operating speed | 120 km/h (avg) |
---|
Route Map
The Azure Line is a rapid transit/heavy rail route operated by OrchidLink.
History
On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever.
[To be completed]