The District of Joban Azure Line

Azure Line

From The District of Joban
Azure Line
Orchidlink azureline opening poster.png
A poster made for the opening of Azure Line
Overview
Status Operational
Owner OrchidLink
Termini Odysseus
Kakai
Stations 11
Service
Type Rapid Transit
Operator(s) OrchidLink
History
Opened November 12th, 2023
Operating speed 120 km/h (avg)
Route Map
Azure Line Routemap.png


The Azure Line is a rapid transit/heavy rail route operated by OrchidLink.

History

On November 12th, 2023, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever.


[To be completed]