The District of Joban Difference between revisions of "Fuka Station"

Difference between revisions of "Fuka Station"

From The District of Joban
(T1 ground platform)
(Underground & P11-P12)
Line 49: Line 49:
== Station Layout ==
== Station Layout ==
=== Terminal 1 ===
=== Terminal 1 ===
==== At-Grade ====
{|border=0 cellspacing=0 cellpadding=5 style="width:100%"
{|border=0 cellspacing=0 cellpadding=5 style="width:100%"
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;vertical-align:top;" rowspan="15"|'''G'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;vertical-align:top;" rowspan="19"|'''G'''
|-
|style="border-left:solid 2px black;border-right:solid 2px black;border-bottom:solid 2px black;border-top:solid 1px gray;text-align:center;" colspan=2|<small>Side Platform</small>
|-
|Platform '''11'''</span>
|[[Fuka Lightrail]] termination platform →
|-
|style="border-top:solid 1px gray;"|Platform '''12'''</span>
|style="border-top:solid 1px gray;"|← [[Fuka Lightrail]] towards [[Drayton_Station|Drayton]]
|-
|style="border-left:solid 2px black;border-right:solid 2px black;border-top:solid 2px black;text-align:center;" colspan=2|<small>Side Platform</small>
|-
|-
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" rowspan="2"|Concourse
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" rowspan="2"|Concourse
Line 89: Line 98:
|style="border-bottom:solid 1px gray;"|Platform '''8'''</span>
|style="border-bottom:solid 1px gray;"|Platform '''8'''</span>
|style="border-bottom:solid 1px gray;"|← [[Joestu_Line|Joestu Line (City Section)]] towards [[Central South]]
|style="border-bottom:solid 1px gray;"|← [[Joestu_Line|Joestu Line (City Section)]] towards [[Central South]]
|-
|style="border-bottom:solid 1px gray;vertical-align:top;" rowspan="7"|'''L1'''
|-
|style="border-bottom:solid 1px gray;" rowspan="2"|Concourse
|Exit '''N/A''' and '''N/A'''
|-
|style="border-bottom:solid 1px gray;"|Rigel Concourse
|-
|Platform '''9'''</span>
|[[Rigel Line]] towards [[Draco_Station|Draco]] →
|-
|style="border:solid 2px black;text-align:center;" colspan=2|<small>Island Platform</small>
|-
|style="border-bottom:solid 1px gray;"|Platform '''10'''</span>
|style="border-bottom:solid 1px gray;"|← [[Rigel Line]] towards [[Fustersa_Station|Fustersa]]
|}
|}

Revision as of 11:06, 27 April 2022

負荷
Fuka
Fuka.jpg
Platform 1-8 of Fuka Stations
General information
Location Joban
Coordinates 4984 -1053
Line(s) Joestu Line
Tohoku Shinkansen
Rigel Line
Airport Express
Fuka Lightrail
Platforms 22
Tracks 26
Construction
Structure Type At-Grade/
Underground
Platform Levels 3
Disabled Access Partial
History
Opened Jan 3, 1960

Fuka (Chinese: 負荷) is a station.

History

Merger

On 2015, an plan was proposed to merge the Metropolis Station and the East Fuka Station as they are too close to Fuka.

Historically, these stations are operated by Harmony Rail Transit and is completely separate from Fuka Station.

This proposal involves making a tunnel to link between all stations, then eventually unifying the paid area and all electronic systems.

While the plan was rejected by Harmony Rail Transit and Rigel Corp, the government stated that it could benefit citizens in the long run.

After further negotiations, all 3 stations are merged as of July 2015.

However, no further action has been taken besides the name being changed as of 2022

In 2016, a new Metropolis Station was later plotted further away from Fuka, Nad lines that were serving the Old Metropolis station started migrating away to the new Metropolis Station.


The Southern Line would operate as branches, with one train going to Metropolis and one train going to Fuka.

The Metropolis Line will only serve the New Metropolis Platform, however the old platform is still being used as an Emergency Platform for Freight Trains.


The North East Line has also ceased operations, leaving the old Metropolis station useless.


As of 2022, only the upcoming Nam Tung Line will utilize 2 Old Metropolis Platforms.

Station Layout

Terminal 1

G
Side Platform
Platform 11 Fuka Lightrail termination platform →
Platform 12 Fuka Lightrail towards Drayton
Side Platform
Concourse Exit A and B
KCR Concourse
Platform 1 Tohoku Shinkansen termination platform →
Island Platform
Platform 2 Tohoku Shinkansen towards Adobe
Platform 3 Tohoku Shinkansen towards Touhou
Island Platform
Platform 4 Tohoku Shinkansen towards Touhou
Platform 5 Joestu Line (Countryside Section) towards Kansai Rinkai Park
Island Platform
Platform 6 Joestu Line (Countryside Section) terminating platform
Platform 7 Joestu Line (City Section) towards Akasaka
Island Platform
Platform 8 Joestu Line (City Section) towards Central South
L1
Concourse Exit N/A and N/A
Rigel Concourse
Platform 9 Rigel Line towards Draco
Island Platform
Platform 10 Rigel Line towards Fustersa