Fuka Station
Views
Actions
Namespaces
Variants
Tools
Location | Joban |
---|---|
Coordinates | 4984 -1053 |
Line(s) | Joestu Line Tohoku Shinkansen Rigel Line Airport Express Fuka Lightrail |
Platforms | 22 |
Tracks | 26 |
Structure Type | At-Grade/ Underground |
---|---|
Platform Levels | 3 |
Disabled Access | Partial |
Opened | Jan 3, 1960 |
---|
Fuka Station (Chinese: 負荷站) is a station, located in the Fuka Area in the The District of Joban Server.
History
Fuka Terminal 3
On 2015, an plan was proposed to merge the Metropolis Station and the East Fuka Station as they are too close to Fuka.
Historically, these stations are operated by Harmony Rail Transit and is completely separate from Fuka Station.
This proposal involves making a tunnel to link between all stations, then eventually unifying the paid area and all electronic systems.
While the plan was rejected by Harmony Rail Transit and Rigel Corp, the government stated that it could benefit citizens in the long run.
After further negotiations, all 3 stations are merged as of July 2015.
However, no further action has been taken besides the name being changed as of 2022
In 2016, a new Metropolis Station was later plotted further away from Fuka, several lines that were serving the Old Metropolis station started migrating away to the new Metropolis Station.
The Southern Line would operate as branches, with one train going to Metropolis and one train going to Fuka.
The Metropolis Line will only serve the New Metropolis Platform, however the old platform is still being used as an Emergency Platform for Freight Trains.
The North East Line has also ceased operations, leaving the old Metropolis station empty.
As of 2022, only the upcoming Nam Tung Line will utilize 2 Old Metropolis Platforms.
Due to the lacking demand for new Routes in Fuka Station, the Fuka Terminal 3 has officially been abandoned as of 2023.
The upcoming connection tunnel between Fuka and Metropolis will be closed forever, leaving a large, inaccessible underground network near Fuka.
Station Layout
Terminal 1
D | Deck | Observation Tower |
UG | Passageway | Towards Platform 1 to 8 |
G | KCR Concourse | Exit A and B |
Automatic Teller Machine, Customer Service, Shops, Station Garden | ||
Platform 1 | Tohoku Shinkansen termination platform → | |
Island Platform, doors will open on the left or right | ||
Platform 2 | ← Tohoku Shinkansen towards Central South | |
Platform 3 | ← Tohoku Shinkansen towards Touhou | |
Island Platform, doors will open on the left or right | ||
Platform 4 | ← Tohoku Shinkansen towards Touhou | |
Platform 5 | Joestu Line (Countryside Section) towards Kansai Rinkai Park → | |
Island Platform, doors will open on the left or right | ||
Platform 6 | ← Joestu Line (Countryside Section) terminating platform | |
Platform 7 | Joestu Line (City Section) towards Akasaka → | |
Island Platform, doors will open on the left or right | ||
Platform 8 | ← Joestu Line (City Section) towards Central South | |
Side Platform, doors will open on the left | ||
Platform 11 | Fuka Lightrail termination platform → | |
Platform 12 | ← Fuka Lightrail towards Drayton | |
Side Platform, doors will open on the left | ||
LG | Passageway | Platform 13 towards Exit B and Platform 12 |
L1 | Rigel Concourse | Exit A, B, and C |
Customer Service, Lost Property Office, Concessionary Travel Office, Shops | ||
L2 | Platform 9 | Rigel Line towards Draco → |
Island Platform, doors will open on the right | ||
Platform 10 | ← Rigel Line towards Airport (Terminal 1) | |
L3 | Passageway | Towards Terminal 2 and 3 |
Terminal 2
C | ||
Airport Express Concourse | Exit A | |
Customer Service, In-town Check-in, Left Baggage, Waiting Room | ||
L1 | Passageway | Towards Platform 13 and 14 |
P | ||
Side Platform, doors will open on the left | ||
Platform 13 | Airport Express termination platform → | |
Platform 14 | ← Airport Express towards Airport (Terminal 1) | |
Side Platform, doors will open on the left |