The District of Joban Difference between revisions of "Rigel Line"

Difference between revisions of "Rigel Line"

From The District of Joban
Line 20: Line 20:
The route has a total of '''8''' Stations.
The route has a total of '''8''' Stations.


=History=
==History==
==Planning==
===Planning===
In Railway Development Strategy report 2004, a new line was settled and was split into 2 phases.
In Railway Development Strategy report 2004, a new line was settled and was split into 2 phases.


Line 84: Line 84:
In April 2004, 10 sets of 4 car trains are ordered by Rigel Corp and will be constructed by [[CAF]].
In April 2004, 10 sets of 4 car trains are ordered by Rigel Corp and will be constructed by [[CAF]].


==2005==
===2005===
In February 2005, the tunnel and station constructions for Phase 1 has begin which consisted of 3 stations with a total of 1534m long.
In February 2005, the tunnel and station constructions for Phase 1 has begin which consisted of 3 stations with a total of 1534m long.


Line 91: Line 91:
By August 2005, all tunnel and station constructions has completed, and began the installation of electricity, air conditioning and signaling system.
By August 2005, all tunnel and station constructions has completed, and began the installation of electricity, air conditioning and signaling system.


==2006==
===2006===
In May 3rd 2006, the Phase 1 section of Rigel Line is opened for public.
In May 3rd 2006, the Phase 1 section of Rigel Line is opened for public.


==2013==
===2009 Airport Railway Proposal===
With 3
WIP
 
===2011 Train underframe cracking===
In April 2011, 2 CAF Train experienced a loss of traction power after departing from [[Auriga Station]] and [[Odysseus Station]] respectively.
 
Following the examination of the train, cracks were discovered on parts of the underframe component on 5 other trains.
 
In June 2011, 12 sets of 5-car K-Train manufactured by Rotem is ordered and delivered by 2013.
 
The affected CAF Train is taken out of service and retired shortly after.
 
As of 2022, there are 5 CAF Trains remaining on the line and 21 sets of K-Train
 
===2013 6-Cars expansion===
6 Cars Platform were reserved on all stations since the opening of the Rigel Line.
 
As passenger demands rise, the first 6-Cars trains is put on services in August 2013.
 
Since then, trains are slowly transformed from 5-Cars to 6-Cars configuration, until all trains are transformed to 6-Cars in 2021.

Revision as of 12:42, 11 April 2022

Rigel Line


Rigel caf.png
An Rigel CAF Train boarding at Fuka station
Overview
Termini Fustersa
Draco
Number of stations 8
Service
Type Rapid Transit
Operator(s) Rigel Corporation
Rolling stock Adtranz–CAF
Rotem EMU
Depot(s) Airport
Route Map
Rigel rtmap.png

The Rigel Line (Chinese: 里格爾綫) is a rapid transit operated by Rigel Corp.

The route has a total of 8 Stations.

History

Planning

In Railway Development Strategy report 2004, a new line was settled and was split into 2 phases.

Phase One

Station Name Station Name (English) Connections Opening Date
負荷 Fuka Joestu Line, Fuka Light Rail
Tohoku Shinkansen
Airport Express
March 3, 2006
卡理特 Crater March 3, 2006
達科 Draco Southern Line March 3, 2006

Phase Two

Station Name Station Name (English) Connections Opening Date
尤利西斯 Ulysses Fuka Light Rail May 10, 2008
奧德修斯 Odysseus December 17, 2008
奧拉加 Auriga May 10, 2008
立達勞斯 Eridanus May 10, 2008
福斯特薩 Fustersa Joestu Line, Airport Express May 10, 2008

The phase 2 section is intended to compete with KCR Joestu Line City Section, running from Fuka to Fustersa.

In April 2004, 10 sets of 4 car trains are ordered by Rigel Corp and will be constructed by CAF.

2005

In February 2005, the tunnel and station constructions for Phase 1 has begin which consisted of 3 stations with a total of 1534m long.

During May 2005, 10 sets of trains are delivered to Rigel Corp.

By August 2005, all tunnel and station constructions has completed, and began the installation of electricity, air conditioning and signaling system.

2006

In May 3rd 2006, the Phase 1 section of Rigel Line is opened for public.

2009 Airport Railway Proposal

WIP

2011 Train underframe cracking

In April 2011, 2 CAF Train experienced a loss of traction power after departing from Auriga Station and Odysseus Station respectively.

Following the examination of the train, cracks were discovered on parts of the underframe component on 5 other trains.

In June 2011, 12 sets of 5-car K-Train manufactured by Rotem is ordered and delivered by 2013.

The affected CAF Train is taken out of service and retired shortly after.

As of 2022, there are 5 CAF Trains remaining on the line and 21 sets of K-Train

2013 6-Cars expansion

6 Cars Platform were reserved on all stations since the opening of the Rigel Line.

As passenger demands rise, the first 6-Cars trains is put on services in August 2013.

Since then, trains are slowly transformed from 5-Cars to 6-Cars configuration, until all trains are transformed to 6-Cars in 2021.