Difference between revisions of "Tohoku Shinkansen"
Views
Actions
Namespaces
Variants
Tools
Guangyou233 (talk | contribs) (add mtpolis to tinimi list) |
|||
Line 1: | Line 1: | ||
{{InfoBox route|title=Tohoku Shinkansen|rolling_stock=[https://en.wikipedia.org/wiki/MTR_Adtranz%E2%80%93CAF_EMU Adtranz-CAF]|electrification=3 kV DC|track_gauge=1,435mm|line_length=35km|technical_category=Technical|line_opened=July 7, 2001|hist_category=History|former_rolling_stock=[https://en.wikipedia.org/wiki/MTR_Rotem_EMU Rotem EMU]|operators=[[KCR]]|colorline1=#1BC4EF|line_type=High-speed rail|service_category=Service|station_amount=8|terminus=[[Central_South_Station|Central South]]<br>[[Fuka_Station|Fuka]]<br>[[Anda_Station|Anda]]<br>[[Touhou_Station|Touhou]]|status=Operational|general_category=Overview|image_desc=An KCR E5 CAF Train boarding at [[Central South station]]|image=2022-03-08_12.43.12.png|operate_speed=200km/h-300km/h}} | {{InfoBox route|title=Tohoku Shinkansen|rolling_stock=[https://en.wikipedia.org/wiki/MTR_Adtranz%E2%80%93CAF_EMU Adtranz-CAF]|electrification=3 kV DC|track_gauge=1,435mm|line_length=35km|technical_category=Technical|line_opened=July 7, 2001|hist_category=History|former_rolling_stock=[https://en.wikipedia.org/wiki/MTR_Rotem_EMU Rotem EMU]|operators=[[KCR]]|colorline1=#1BC4EF|line_type=High-speed rail|service_category=Service|station_amount=8|terminus=[[Central_South_Station|Central South]]<br>[[Fuka_Station|Fuka]]<br>[[Anda_Station|Anda]]<br>[[Touhou_Station|Touhou]]<br>[[Metropolis_Station|Metropolis]]|status=Operational|general_category=Overview|image_desc=An KCR E5 CAF Train boarding at [[Central South station]]|image=2022-03-08_12.43.12.png|operate_speed=200km/h-300km/h}} | ||
The Tohoku Shinkansen (Chinese: 東北新幹線) is a High Speed Rail operated by [[KCR]]. | The Tohoku Shinkansen (Chinese: 東北新幹線) is a High Speed Rail operated by [[KCR]]. |
Revision as of 23:43, 21 November 2023
Status | Operational |
---|---|
Termini | Central South Fuka Anda Touhou Metropolis |
Stations | 8 |
Type | High-speed rail |
---|---|
Operator(s) | KCR |
Rolling stock | Adtranz-CAF |
Former Rolling Stock | Rotem EMU |
Opened | July 7, 2001 |
---|
Line Length | 35km |
---|---|
Track gauge | 1,435mm |
Electrification | 3 kV DC |
Operating speed | 200km/h-300km/h |
The Tohoku Shinkansen (Chinese: 東北新幹線) is a High Speed Rail operated by KCR.
The route has a total of 8 Stations.
List of Stations and service
● | Stop |
---|---|
N/A | Not via |
| | Pass |
Station Name | Station Name (English) | Azuma | Asama | Komachi | Hayate | Hayabusa | Transfers |
---|---|---|---|---|---|---|---|
中環南 | Central South | N/A | N/A | N/A | ● | ● | Joestu Line Tsz Kiu Line Shuntien Line North South Line Central Light Rail Fuka Lightrail Rigel Line Airport Express Seiyo Shinkansen |
湘南 | Shonan | N/A | N/A | N/A | | | ● | Tsz Kiu Line North South Line Central Light Rail |
光石 | Lightstone | N/A | N/A | N/A | ● | | | Rigel Line Metropolis Line |
負荷 | Fuka | N/A | ● | ● | ● | | | Joestu Line Rigel Line Airport Express Fuka Lightrail |
都心 | Metropolis | N/A | ● | | | N/A | ● | Watson Station |
瑟里石礦場 | Surry Quays | N/A | ● | | | N/A | N/A | Kansai APM |
安達 | Anda | ● | ● | | | N/A | N/A | |
東方 | Touhou | N/A | ● | ● | N/A | N/A | Joestu Line Aozora Line |
喬斯圖 | Joestu | ● | N/A | N/A | N/A | N/A | Joestu Line |
Route Map
Rolling stock
As of March 2023, the following types are used on Tohoku Shinkansen services.
- E7 series: Asama services
- 802 series: Azuma services
- K3-900 series: Komachi Services
- K5 series: Hayate services
- K5N series: Hayabusa services
History
The Tohoku Shinkansen was formerly known as the Joestu Express and Sleigh Liner
Joestu Express
Joestu Express had a total of 3 Stations, planned for 6 cars.
Watson East Station has been renamed to Shenshui.
Station Name | Station Name (English) | Connections | Opening Date |
負荷 | Fuka | Joestu Line, Fuka Lightrail | 7 July 2001 |
華生東 | Watson East | Watson Station | 7 July 2001 |
阿豆比 | Adobe | Surry Quays | 7 July 2001 |
Dispute
Platforms use by Joestu Express in Fuka design just for 4 cars, but Watson East and Adobe already build platforms for 6 cars,finally plan Joestu Express both 4 cars and 6 cars are run on the Joestu Express.6 car arrive Shenshui Station will switch rail to opposide platform and then turn back to Adobe.
Sleigh Liner
The KCRC also made proposals to plan, build, and operate the Sleigh Liner, a new railway parallel to Joestu Line to make going to Sendai faster; the KCRC received permission for the project from the government on 24 September 2007. Disputes on the funding and, postponed the construction by a year to 2008. Construction started on 7 June 2008. The new link started operation on 16 August 2010.
Sleigh Liner first plan has total of 3 Stations , plan for 4 cars.
Station Name | Station Name (English) | Connections | Opening Date |
---|---|---|---|
負荷 | Fuka | Joestu Line, Fuka Lightrail
Rigel Line,Airport Express,Joestu Express |
16 August 2010 |
阿豆比 | Adobe | Joestu Express | 16 August 2010 |
東方 | Touhou | Joestu Line,Aozora Line | 16 August 2010 |
Merge
Various proposals to merge the KCRC and the other railway operator in the territory, the Victoria Railway, had been on the government's agenda since the 2010s. In 2011, the government, as the sole shareholder of the KCRC, decided that the two railway networks should be merged with the KCRC being granted a service concession to operate the VR network for an initial period of 11 years. The decision was passed by the Executive Council on 11 April 2012, and was later approved by the Legislative Council and the minority shareholders of the VR (the government, which had a 75% stake in the VR, did not vote).