Difference between revisions of "Rigel Line"
Views
Actions
Namespaces
Variants
Tools
(New infobox) |
m (Typo) |
||
Line 1: | Line 1: | ||
{{InfoBox route|title=Rigel Line|depots=[[Airport]]|rtmap_image=Rigel rtmap.png|rtmap_category=Route Map|electrification=1.5 kV DC|track_gauge=1,435mm|line_length=5.7km (3.5mi)| | {{InfoBox route|title=Rigel Line|depots=[[Airport]]|rtmap_image=Rigel rtmap.png|rtmap_category=Route Map|electrification=1.5 kV DC|track_gauge=1,435mm|line_length=5.7km (3.5mi)|technical_category=Technical|line_opened=May 3, 2006|hist_category=History|owner=[[Rigel Corporation]]|colorline1=#0066BB|rolling_stock=[https://en.wikipedia.org/wiki/MTR_Adtranz%E2%80%93CAF_EMU Adtranz-CAF]<br>[https://en.wikipedia.org/wiki/MTR_Rotem_EMU Rotem EMU]|operators=[[Rigel Corporation]]|line_type=Rapid Transit|service_category=Service|terminus=[[Fustersa_Station|Fustersa]]<br>[[Draco_Station|Draco]]|locale=Joban|general_category=Overview|image_desc=An Rigel CAF Train boarding at [[Fuka_Station|Fuka station]]|image=rigel_caf.png|operate_speed=55km/h (Average)}} | ||
The '''Rigel Line''' (Chinese: 里格爾綫) is a rapid transit operated by [[Rigel Corporation|Rigel Corp]]. | The '''Rigel Line''' (Chinese: 里格爾綫) is a rapid transit operated by [[Rigel Corporation|Rigel Corp]]. |
Revision as of 17:24, 27 April 2022
Owner | Rigel Corporation |
---|---|
Locale | Joban |
Termini | Fustersa Draco |
Type | Rapid Transit |
---|---|
Operator(s) | Rigel Corporation |
Depot(s) | Airport |
Rolling stock | Adtranz-CAF Rotem EMU |
Opened | May 3, 2006 |
---|
Line Length | 5.7km (3.5mi) |
---|---|
Track gauge | 1,435mm |
Electrification | 1.5 kV DC |
Operating speed | 55km/h (Average) |
The Rigel Line (Chinese: 里格爾綫) is a rapid transit operated by Rigel Corp.
The route has a total of 8 Stations.
History
Planning
In Railway Development Strategy report 2004, a new line was settled and was split into 2 phases.
Phase One
Station Name | Station Code | Connections | Opening Date |
---|---|---|---|
負荷 Fuka | FUK | Joestu Line, Fuka Lightrail Tohoku Shinkansen Airport Express |
March 3, 2006 |
卡理特 Crater | CRA | March 3, 2006 | |
達科 Draco | DRA | Southern Line | March 3, 2006 |
Phase Two
Station Name | Station Code | Connections | Opening Date |
---|---|---|---|
尤利西斯 Ulysses | ULY | Fuka Lightrail | May 10, 2008 |
奧德修斯 Odysseus | ODY | December 17, 2008 | |
奧拉加 Auriga | AUR | May 10, 2008 | |
立達勞斯 Eridanus | ERI | May 10, 2008 | |
福斯特薩 Fustersa | FUS | Joestu Line, Airport Express | May 10, 2008 |
The phase 2 section is intended to compete with KCR Joestu Line City Section, running from Fuka to Fustersa.
In April 2004, 10 sets of 4 car trains are ordered by Rigel Corp and will be constructed by CAF.
2005
In February 2005, the tunnel and station constructions for Phase 1 has begin which consisted of 3 stations with a total of 1534m long.
During May 2005, 10 sets of trains are delivered to Rigel Corp.
By August 2005, all tunnel and station constructions has completed, and began the installation of electricity, air conditioning and signaling system.
2006
In May 3rd 2006, the Phase 1 section of Rigel Line is opened for public.
2009 Airport Railway Proposal
WIP
2011 Train underframe cracking
In April 2011, 2 CAF Train experienced a loss of traction power after departing from Auriga Station and Odysseus Station respectively.
Following the examination of the train, cracks were discovered on parts of the underframe component on 5 other trains.
In June 2011, 12 sets of 5-car K-Train manufactured by Rotem is ordered and delivered by 2013.
The affected CAF Train is taken out of service and retired shortly after.
As of 2022, there are 5 CAF Trains remaining on the line and 21 sets of K-Train
2013 6-Cars expansion
6 Cars Platform were reserved on all stations since the opening of the Rigel Line.
As passenger demands rise, the first 6-Cars trains is put on services in August 2013.
Since then, trains are slowly transformed from 5-Cars to 6-Cars configuration, until all trains are transformed to 6-Cars in 2016.