The District of Joban Tohoku Shinkansen

Tohoku Shinkansen

From The District of Joban
Revision as of 12:22, 27 August 2024 by GabrielAstock (talk | contribs)
Tohoku Shinkansen
2022-03-08 12.43.12.png
An KCR E5 CAF Train boarding at Central South Station
General
Status Operational
Termini Central South
Fuka
Anda
Touhou
Metropolis
Stations 8
Service
Type High-speed rail
Operator(s) KCR
Rolling stock Adtranz-CAF
Former Rolling Stock Rotem EMU
History
Opened July 7, 2001
Technical
Line Length 35km
Track gauge 1,435mm
Electrification 3 kV DC
Operating speed 200km/h-300km/h


The Tohoku Shinkansen (Chinese: 東北新幹線) is a High Speed Rail operated by KCR.

The route has a total of 8 Stations.

List of Stations and service

Stop
N/A Not via
Pass
Station Name Station Name (English) Azuma Asama Komachi Hayate Hayabusa Transfers
中環南 Central South N/A N/A N/A Joestu Line
Tsz Kiu Line
Shuntien Line
North South Line
Central Light Rail Fuka Lightrail
Rigel Line
Airport Express
Seiyo Shinkansen
湘南 Shonan N/A N/A N/A
Tsz Kiu Line
North South Line
Central Light Rail
光石 Lightstone N/A N/A N/A
Rigel Line
Metropolis Line
負荷 Fuka N/A Joestu Line
Rigel Line
Airport Express
Fuka Lightrail
都心 Metropolis N/A N/A Watson Station
瑟里石礦場 Surry Quays N/A N/A N/A Kansai APM

Grundorf Express

安達 Anda N/A N/A
東方 Touhou N/A N/A N/A Joestu Line
Aozora Line
喬斯圖 Joestu N/A N/A N/A N/A Joestu Line

Route Map

TS RouteMap.png

Rolling stock

As of March 2023, the following types are used on Tohoku Shinkansen services.

  • E7 series: Asama services
  • 802 series: Azuma services
  • K3-900 series: Komachi Services
  • K5 series: Hayate services
  • K5N series: Hayabusa services

History

The Tohoku Shinkansen was formerly known as the Joestu Express and Sleigh Liner

Joestu Express

Joestu Express had a total of 3 Stations, planned for 6 cars.

Watson East Station has been renamed to Shenshui.

Joestu Express
Station Name Station Name (English) Connections Opening Date
負荷 Fuka Joestu Line, Fuka Lightrail

Rigel Line Airport Express

7 July 2001
華生東 Watson East Watson Station 7 July 2001
阿豆比 Adobe Surry Quays 7 July 2001

Mixed Fleet Operation

An Joestu Express 6 car K-Train boarding at Shenshui Station.

Platforms used by Joestu Express at Fuka were designed for only 4 cars, but Watson East and Adobe had platforms reserved for 6 car trains, with Joestu Express running 4 and 6 car trains. 6 car trains due to the limited platform space at Fuka will terminate at Shenshui and turn back to Adobe.


Sleigh Liner

The KCRC also made proposals to plan, build, and operate the Sleigh Liner, a new railway parallel to Joestu Line to make going to Sendai faster; the KCRC received permission for the project from the government on 24 September 2007. Disputes on the funding and, postponed the construction by a year to 2008. Construction started on 7 June 2008. The new link started operation on 16 August 2010.

Sleigh Liner first plan has total of 3 Stations , plan for 4 cars.

Sleigh Liner
Station Name Station Name (English) Connections Opening Date
負荷 Fuka Joestu Line, Fuka Lightrail

Rigel Line,Airport Express,Joestu Express

16 August 2010
阿豆比 Adobe Joestu Express 16 August 2010
東方 Touhou Joestu Line,Aozora Line 16 August 2010

Merger with joestu Express

Victoria Railway, the operator of Joestu Express had been considered to be merged with KCRC since the early 2010s, with VR's limited resources and with fierce competition from KCRC and nearing bankruptcy, approached the Government in 2011 requesting for a merger with KCRC with the KCRC being granted a service concession to operate the VR network for an initial period of 11 years. The decision was passed by the Executive Council on 11 April 2012, and was later approved by the Legislative Council and the minority shareholders of VR (the government, which had a 75% stake in VR, did not vote).